Adoption of the South Poplar Masterplan SPD
The South Poplar Masterplan SPD project seeks
to provide guidance on the implementation of policies in the Tower
Hamlets Local Plan 2031. The SPD will also aim to align with the
recommendations contained within the Mayor of London’s Isle
of Dogs and South Poplar Opportunity Area Planning Framework
(adopted October 2019).
Once adopted, the document will have weight as a material planning
consideration setting out the Council’s expectations for
planning submissions. In this respect, the document will be a key
reference point for developments within the area. Overall, it is
intended for South Poplar to share in the benefits of good growth,
improved transport capacity and connectivity, be provided with
social infrastructure alongside development, benefit from joined up
development across different land ownership and be protected
against the construction impacts of future developments. The
masterplan will optimise land around a transport hub and provide
more certainty within the development management process
The SPD masterplan area is primarily informed by Local Plan Site
allocations as well as adjacent sites considered integral to the
delivery of important spatial goals. In particular, the masterplan
area contains the North Quay, Billingsgate Market and Aspen Way
site allocations. The SPD study area is located to the northern
part of the Isle of Dogs and south of Poplar High Street. The
Masterplan will cover an area included within the Poplar and Canary
Wharf Council wards.
Within the South Poplar area, there are a number of development
sites that have come forward, signalling the developer interest in
the area. Each of the sites within the masterplan are at varying
stages of the development process, however are likely to come
forward in the very near future. To respond to the various
challenges presented on each development site, this masterplan
seeks to provide high quality, sustainable, deliverable guidance
and strategies to ensure future development is delivered in
accordance with the adopted Local Plan. The SPD will support
priority 1 - People are aspirational, independent and have equal
access to opportunities -and 2 - A borough that our residents are
proud of and love to live in- of the Mayor’s Strategic
Plan.
The South Poplar Masterplan SPD has been through an extensive
preparation process. This includes a baseline analysis and early
engagement carried out during August-December 2020, such as
mapping; site analysis, opportunities and constraints; structural
analysis, initial consultation with stakeholders; an online survey
and online exhibition.
Preparation of a draft document was carried out between December
2020 and March 2021. Public consultation was then carried out
during 09 March-20 April 2021. A wide range of community groups,
residents, landowners and other stakeholders engaged with the SPD
and made formal responses as part of the consultation
process.
It is now necessary to adopt the South Poplar Masterplan SPD to
further enable clear and robust guidance to inform and be
implemented in development proposals. The SPD will allow the
delivery of a shared vision, which will ensure that existing
character is respected and enhanced; and the new developments are
of the highest quality in accordance with corporate and Council
objectives and the Development Plan (Local Plan and London
Plan).
Decision type: Key
Reason Key: Significant impact on communities living or working in two or more wards;
Decision status: Recommendations Approved
Wards affected: Blackwall & Cubitt Town; Canary Wharf; Island Gardens; Poplar;
Notice of proposed decision first published: 01/06/2021
Decision due: 28 Jul 21 by Cabinet
Lead member: Cabinet Member for Planning and Social Inclusion (Job Share) - Lead on Planning, Cabinet Member for Social Inclusion – (Job Share post as part of Social Inclusion and Public Realm portfolio)
Lead director: Corporate Director, Place
Department: Place
Contact: Jennifer Peters, (Divisional Director, Planning and Building Control, Place) Email: Jennifer.Peters@towerhamlets.gov.uk.
Consultation process
The South Poplar Masterplan SPD ran a public
consultation between 6 March to 20 April 2021. This extended beyond
the required four-week consultation period. Due to the coronavirus
pandemic, no in-person events could be held during the consultation
period, but a series of online meetings with internal and statutory
consultees were held, as well as an online public ‘open
invite meeting. A survey was placed online with links to the draft
document and statutory consultees were contacted.
A copy of the SPD was made available on the council’s
Let’s Talk Tower Hamlets website. Details of the consultation
activities (including activities undertaken at earlier stages of
the SPD development process) can be found in Appendix 2 –
Consultation and Engagement Report.
Consultees
Please find detailed list of consultees in
Appendix 2 – Consultation and Engagement Report.
Has an Equality Analysis been carried out and if so the result of this Assessment?: no further assessment needed
What supporting documents or other information will be available?: Appendix 1 – South Poplar Masterplan SPD Appendix 2 – Consultation and Engagement Report Appendix 3 - SEA/HRA Screening Determination Letter Appendix 4 - Equalities Impact Assessment Screening
Decisions
- 30/07/2021 - Adoption of the South Poplar Masterplan SPD
Agenda items
- 28/07/2021 - Cabinet Adoption of the South Poplar Masterplan SPD 28/07/2021
Documents
- Adoption of the South Poplar Masterplan SPD