Issue details
Adoption of the Queen Mary University London SPD
The QMUL Mile End Campus Supplementary
Planning Document (SPD) is a masterplan document which provides
guidance to inform the future growth and development of the Queen
Mary University London (QMUL) Mile End Campus.
It is the aim of the SPD to ensure that future development on this
campus is considered in the context of a site-wide masterplan in
order to enhance the quality of the estate while strengthening the
public realm; providing appropriate building mass and height;
improving pedestrian and cycle connectivity; enhancing the setting
of heritage assets; integrating the campus more successfully with
its surroundings; and creating a more welcoming campus environment.
The SPD also considers how the growth of the campus can maximise
community benefits, biodiversity opportunities and environmental
sustainability.
Taking into account the above, the SPD includes a series of
site-specific development principles for five key development
areas. Each development area is supported by illustrative massing
sketches, or ‘case studies’ to give an indication of
how development might look.
The SPD supports the vision, objective and policies of the Tower
Hamlets Local Plan 2031. This includes the vision for the Local
Plan’s ‘Central Area’, and the objective to
‘support the expansion of Queen Mary University of London and
associated uses, while ensuring good integration with surrounding
areas’.
The document will provide material weight in planning decisions;
and will therefore help the council to evaluate individual planning
applications on the campus to assess whether they are in line with
the coherent growth strategy set out within the SPD. The SPD will
therefore provide more certainty within the development management
process as individual sites come forward.
In total, the SPD masterplan creates the total addition of c.
60,000 sqm of non-residential floorspace and the net reduction of
c. 175 student bedrooms.
The QMUL Mile End Campus SPD has been through an extensive
preparation process. This includes evidence-base gathering and
early masterplanning carried out during July-September 2020, such
as mapping; site visits; initial consultation with stakeholders;
public realm analysis; and transport evidence.
Preparation of a draft document was carried out between September
2020 and February 2021. Public consultation was then carried out
during February-March 2021. A wide range of community groups,
residents, landowners, university staff and other stakeholders
engaged with the SPD and made formal responses as part of the
consultation process.
It is now necessary to adopt the QMUL Mile End Campus SPD to
further enable clear and robust guidance to inform and be
implemented in development proposals a comprehensive campus-wide
masterplan and vision, which will ensure that existing character is
respected and enhanced; and the new developments are of the highest
quality in accordance with corporate and Council objectives and the
Development Plan (Local Plan and London Plan).
Decision type: Key
Reason Key: Significant impact on communities living or working in two or more wards;
Decision status: Recommendations Approved
Wards affected: Bethnal Green East; Bow West;
Notice of proposed decision first published: 01/06/2021
Decision due: 28 Jul 21 by Cabinet
Lead member: Cabinet Member for Planning and Social Inclusion (Job Share) - Lead on Planning, Cabinet Member for Social Inclusion – (Job Share post as part of Social Inclusion and Public Realm portfolio)
Lead director: Corporate Director, Place
Department: Place
Contact: Jennifer Peters, (Divisional Director, Planning and Building Control, Place) Email: Jennifer.Peters@towerhamlets.gov.uk.
Consultation process
The QMUL Mile End Campus SPD ran a public
consultation between 3 February to 17 March 2021. This extended
beyond the required four-week consultation period. Due to the
coronavirus pandemic, no in-person events could be held during the
consultation period, but a series of online meetings with internal
and statutory consultees were held, as well as an online community
meeting. A map and ‘ideas board’ were set up on the
consultation page, as well as letter drops to local residents
announcing the consultation, and the statutory consultees were
contacted.
A copy of the SPD was made available on the council’s
Let’s Talk Tower Hamlets website. Details of the consultation
activities (including activities undertaken at earlier stages of
the SPD development process) can be found in Appendix 2 –
Consultation Statement.
Consultees
Please find detailed list of consultees in
Appendix 2 – Consultation Statement
Has an Equality Analysis been carried out and if so the result of this Assessment?: Screening Tool at the end of this form, no further assessment needed
What supporting documents or other information will be available?: Appendix 1 – QMUL Mile End Campus SPD Appendix 2 – Consultation and Engagement Report Appendix 3 – SEA/HRA Screening Appendix 4 – Equalities Impact Assessment Screening
Decisions
- 30/07/2021 - Adoption of the Queen Mary University London SPD
Agenda items
- 28/07/2021 - Cabinet Adoption of the Queen Mary University London SPD 28/07/2021
Documents
- Adoption of the Queen Mary University London SPD