94 Fairfield Road, London, E3 2QP
Decision:
On a unanimous vote the Committee RESOLVED that (1) planning permission for the demolition of existing structures and the erection of 86 new dwellings, including affordable housing in a building extending between 2 and 9 storeys in height be GRANTED subject to:
A |
The prior completion of a legal agreement to secure the following planning obligations:
|
|
B. That the Corporate Director Development & Renewal has delegated power to negotiate the legal agreement indicated above. |
|
|
|
|
|
C. That the Corporate Director Development & Renewal has delegated power to impose conditions and informatives on the planning permission to secure the following matters: |
|
|
|
|
|
Conditions: |
|
|
|
|
|
1) Time limit for Full Planning Permission 2) Submission of material samples 3)Details of lighting within the site 4) Detailed Landscape plan 5) Hours of construction limits 6) Piling hours of operation limits 7) Renewables 8) Contaminated Land 9) Archaeological programme 10) Refuse and recycling 11) Construction management plan 12) Lifetime homes and 10% wheelchair accessible 13) Electric car charging point 14) Code for sustainable homes 15) Details of insulation of the ventilation system and any associated plant required 16) Air quality management 17) Secure by Design 18) Highway works 19) Any other condition(s) considered necessary by the Head of Development Decisions
|
|
|
Informatives |
|
|
|
|
|
1) Subject to S106 agreement 2) Contact Highways Department 3) 278 works surrounding the site 4) Wheel-washing facilities 5) Section 72 works 6) To be read in conjunction with PA/08/1090 and PA/08/1089 |
|
|
|
|
|
That, if by 29 August 2008 the legal agreement has not been completed to the satisfaction of the Chief Legal Officer, the Head of Development Decisions is delegated power to refuse planning permission. |
|
|
|
|
|
(2) That the Committee resolved that Conservation Area Consent be GRANTED subject to: |
|
|
|
|
|
Conditions: |
|
|
|
|
|
1) Time Limit 2) Works in accordance with approved plans 3) Hours of demolition |
|
|
|
|
|
Informative: |
|
|
|
|
|
1) To be read in conjunction with PA/08/1088 and PA/08/1089 |
|
|
(3) That the Committee resolved that Listed Building Consent BE GRANTED subject to: |
|
|
|
|
|
Conditions: |
|
|
|
|
|
1) Time Limit 2) Submission of detailed drawings 3) Submission of samples |
|
|
|
|
|
Informative: |
|
|
|
|
|
1) To be read in conjunction with PA/08/1090 and PA/08/1088 |
|
|
Minutes:
Mr.Terry Natt introduced the report, which he described as having three elements:
1)
The demolition of all existing structures on site
with exemption of Pelican Cottage; and
2)
The erection of 86 mixed new build dwellings;
and
3) Alterations and refurbishment of Pelican Cottage.
In conclusion, it was noted that the design had been worked upon for the last two years.
Members of the Committee asked questions about the location of the site, raised concerns in respect of no provision for pedestrian crossing, the implications for the safety of children using the road and the accessing of the development from one side to the other. Concerns were also raised about consultations on the development and air quality.
In response, Mr.Natt explained that the Highways Department had been consulted about where the movement of people was likely to take place and had registered no concerns. Consultations on the development had taken place on a fairly typical standard consultation exercise. All parties within a one hundred metre radius had been approached for their views.
Finally, air quality was one of the conditions imposed as a condition of approval to ensure all statutory obligations met.
On a unanimous vote the Committee RESOLVED that (1) planning permission for the demolition of existing structures and the erection of 86 new dwellings, including affordable housing in a building extending between 2 and 9 storeys in height be GRANTED subject to:
A |
The prior completion of a legal agreement to secure the following planning obligations:
|
|
B. That the Corporate Director Development & Renewal has delegated power to negotiate the legal agreement indicated above. |
||
|
||
C. That the Corporate Director Development & Renewal has delegated power to impose conditions and informatives on the planning permission to secure the following matters: |
||
|
||
Conditions: |
||
|
||
1) Time limit for Full Planning Permission 2) Submission of material samples 3)Details of lighting within the site 4) Detailed Landscape plan 5) Hours of construction limits 6) Piling hours of operation limits 7) Renewables 8) Contaminated Land 9) Archaeological programme 10) Refuse and recycling 11) Construction management plan 12) Lifetime homes and 10% wheelchair accessible 13) Electric car charging point 14) Code for sustainable homes 15) Details of insulation of the ventilation system and any associated plant required 16) Air quality management 17) Secure by Design 18) Highway works 19) Any other condition(s) considered necessary by the Head of Development Decisions
|
||
Informatives |
||
|
||
1) Subject to S106 agreement 2) Contact Highways Department 3) 278 works surrounding the site 4) Wheel-washing facilities 5) Section 72 works 6) To be read in conjunction with PA/08/1090 and PA/08/1089 |
||
|
||
That, if by 29 August 2008 the legal agreement has not been completed to the satisfaction of the Chief Legal Officer, the Head of Development Decisions is delegated power to refuse planning permission. |
||
|
||
(2) That the Committee resolved that Conservation Area Consent be GRANTED subject to: |
||
|
||
Conditions: |
||
|
||
1) Time Limit 2) Works in accordance with approved plans 3) Hours of demolition |
||
|
||
Informative: |
||
|
||
1) To be read in conjunction with PA/08/1088 and PA/08/1089 |
||
(3) That the Committee resolved that Listed Building Consent BE GRANTED subject to: |
||
|
||
Conditions: |
||
|
||
1) Time Limit 2) Submission of detailed drawings 3) Submission of samples |
||
|
||
Informative: |
||
|
||
1) To be read in conjunction with PA/08/1090 and PA/08/1088 |