Agenda item
London Arena (Phase II), Limeharbour, London E14 9TH
Decision:
The Committee unanimously RESOLVED that planning permission for the amendment to the proposed application, reference PA/06/2068, permitted on 3rd October 2008, involving revised designs, layout and land uses, removing Office (B1) uses and providing 6 additional hotel rooms (143 in total), 195 services apartments, 54 additional residential units (1111 in total), additional retail floorspace, a health club and additional open space at the London Arena (Phase II), Limeharbour, London E14 9TH be GRANTED subject to
A. |
Any direction by The Mayor |
|
|
B. |
The prior completion of a legal agreement, to the satisfaction of the Assistant Chief Executive (Legal Services), to secure the following:
|
|
a) A proportion of 35% on a gross floor space basis of the proposed units to be provided as affordable housing with the socially rented mix as specified in the table attached in Section 8.15.
b) Provide £8,579 towards the installation of Docklands Arrival Information System (DAISY) within the London Arena development.
c) Implement measures to offset signal interruption to mitigate the adverse effects on DLR radio communications.
d) Provide a minimum of £22,763 towards the D5 bus service or new bus service (TFL proposal) and potential new bus stops on East Ferry Road.
e) Provide £7,149 towards general improvements to pedestrian and cycle routes in the area including crossings and new paving surfaces.
f) Provide £4,289 towards the signalisation of the junction of Marsh Wall/Limeharbour with a green man phase.
g) Provide £6,225 towards open space improvements to cater for the demand that will arise from the new housing on existing open space and recreational facilities.
h) Set of measures for the public realm including provision of the public piazza and access to the Dockside Walkway.
i) Provide £30,018 towards education to mitigate the demand of the additional population on education facilities.
j) Provide £163,375 towards medical facilities to mitigate the demand of the additional population on medical facilities.
k) Provide £7,114 towards the Local Labour in Construction (LliC) programme.
l) Provide £4,289 towards Skillsmatch to maximise the employment of local residents.
m) Preparation of a Workplace Travel Plan (including welcome pack for residents).
n) Preparation of a Service and Delivery Plan.
o) Obligations in relation to construction works (noise levels, hours of work, transport arrangements, air quality, method statements) to be secured through a Code of Construction Practice.
p) TV Reception monitoring and mitigation.
q) Preparation and implementation of a public art strategy including involvement of local artists.
r) Completion of a car free agreement to restrict occupants applying for residential parking permits.
s) Preparation of an Environmental Management Plan – post construction.
|
C. That the Head of Development Decisions be delegated authority to impose conditions [and informatives] on the planning permission to secure the following:
Conditions
1) Time limit for full planning permission
2) Details of the following are required to be submitted:
• Elevational treatment including samples of materials for external fascia of building
• Interface of retail areas with public space
• The design of the lower floor elevations of commercial units including shopfronts
• External lighting and security measures
3) Landscape Plan to be submitted
4) Landscape Management Strategy to be submitted
5) Biodiversity Strategy to be submitted
6) Details of signage to be submitted
7) Land contamination study required to be undertaken
8) Hours of construction limits
9) Hours of operation limits – hammer driven piling
10) Details of insulation of ventilation systems and any associated plant to be submitted
11) Details of site drainage to be submitted
12) Full particulars of refuse/recycling/composting storage to be submitted
13) Construction Management Plan to be submitted
14) Details of finished floor levels
15) Details of surface water control measures
16) Detailed Energy Strategy to be submitted
17) Black Redstarts habitat provision required
18) Green roofs
19) Construction operations and impact on dock walls
20) Horizontal access strip from dock wall
21) Materials openings and maintenance regime for boundary with DLR
22) Use of barges
23) Lifetime homes
24) Highways works
25) Archaeological watching brief
26) Parking plan to be submitted
27) Wheel wash facilities
28) Vibration
29) Health Club Management Plan
30) Any other condition(s) considered necessary by the Head of Development Decisions
Informatives
1) Thames Water Advice
2) British Waterways Advice
3) Site notice specifying the details of the contractor.
4) Any other informative(s) considered necessary by the Head of Development Decisions
D. That, if by 10th October 2008 the legal agreement has not been completed to the satisfaction of the Assistant Chief Executive (Legal Services), the Head of Development Decisions be delegated authority to refuse planning permission.
Minutes:
Mr Michael Kiely, Head of Development Decisions, introduced the site and proposal for the amendment to the proposed application, reference PA/06/2068, permitted on 3rd October 2008, involving revised designs, layout and land uses, removing Office (B1) uses and providing 6 additional hotel rooms (143 in total), 195 services apartments, 54 additional residential units (1111 in total), additional retail floorspace, a health club and additional open space at the London Arena (Phase II), Limeharbour, London E14 9TH.
Mr Terry Natt, Strategic Applications Manager, presented a detailed report on the application, outlining the changes which had been made to the mix of uses on the site, compared with that previously approved. He answered Members questions relating to the loss of office space and the S106 contributions.
The Committee unanimously RESOLVED that planning permission for the amendment to the proposed application, reference PA/06/2068, permitted on 3rd October 2008, involving revised designs, layout and land uses, removing Office (B1) uses and providing 6 additional hotel rooms (143 in total), 195 services apartments, 54 additional residential units (1111 in total), additional retail floorspace, a health club and additional open space at the London Arena (Phase II), Limeharbour, London E14 9TH be GRANTED subject to
A. |
Any direction by The Mayor |
|
|
B. |
The prior completion of a legal agreement, to the satisfaction of the Assistant Chief Executive (Legal Services), to secure the following:
|
|
a) A proportion of 35% on a gross floor space basis of the proposed units to be provided as affordable housing with the socially rented mix as specified in the table attached in Section 8.15.
b) Provide £8,579 towards the installation of Docklands Arrival Information System (DAISY) within the London Arena development.
c) Implement measures to offset signal interruption to mitigate the adverse effects on DLR radio communications.
d) Provide a minimum of £22,763 towards the D5 bus service or new bus service (TFL proposal) and potential new bus stops on East Ferry Road.
e) Provide £7,149 towards general improvements to pedestrian and cycle routes in the area including crossings and new paving surfaces.
f) Provide £4,289 towards the signalisation of the junction of Marsh Wall/Limeharbour with a green man phase.
g) Provide £6,225 towards open space improvements to cater for the demand that will arise from the new housing on existing open space and recreational facilities.
h) Set of measures for the public realm including provision of the public piazza and access to the Dockside Walkway.
i) Provide £30,018 towards education to mitigate the demand of the additional population on education facilities.
j) Provide £163,375 towards medical facilities to mitigate the demand of the additional population on medical facilities.
k) Provide £7,114 towards the Local Labour in Construction (LliC) programme.
l) Provide £4,289 towards Skillsmatch to maximise the employment of local residents.
m) Preparation of a Workplace Travel Plan (including welcome pack for residents).
n) Preparation of a Service and Delivery Plan.
o) Obligations in relation to construction works (noise levels, hours of work, transport arrangements, air quality, method statements) to be secured through a Code of Construction Practice.
p) TV Reception monitoring and mitigation.
q) Preparation and implementation of a public art strategy including involvement of local artists.
r) Completion of a car free agreement to restrict occupants applying for residential parking permits.
s) Preparation of an Environmental Management Plan – post construction.
|
C. That the Head of Development Decisions be delegated authority to impose conditions [and informatives] on the planning permission to secure the following:
Conditions
1) Time limit for full planning permission
2) Details of the following are required to be submitted:
• Elevational treatment including samples of materials for external fascia of building
• Interface of retail areas with public space
• The design of the lower floor elevations of commercial units including shopfronts
• External lighting and security measures
3) Landscape Plan to be submitted
4) Landscape Management Strategy to be submitted
5) Biodiversity Strategy to be submitted
6) Details of signage to be submitted
7) Land contamination study required to be undertaken
8) Hours of construction limits
9) Hours of operation limits – hammer driven piling
10) Details of insulation of ventilation systems and any associated plant to be submitted
11) Details of site drainage to be submitted
12) Full particulars of refuse/recycling/composting storage to be submitted
13) Construction Management Plan to be submitted
14) Details of finished floor levels
15) Details of surface water control measures
16) Detailed Energy Strategy to be submitted
17) Black Redstarts habitat provision required
18) Green roofs
19) Construction operations and impact on dock walls
20) Horizontal access strip from dock wall
21) Materials openings and maintenance regime for boundary with DLR
22) Use of barges
23) Lifetime homes
24) Highways works
25) Archaeological watching brief
26) Parking plan to be submitted
27) Wheel wash facilities
28) Vibration
29) Health Club Management Plan
30) Any other condition(s) considered necessary by the Head of Development Decisions
Informatives
1) Thames Water Advice
2) British Waterways Advice
3) Site notice specifying the details of the contractor.
4) Any other informative(s) considered necessary by the Head of Development Decisions
D. That, if by 10th October 2008 the legal agreement has not been completed to the satisfaction of the Assistant Chief Executive (Legal Services), the Head of Development Decisions be delegated authority to refuse planning permission.