4 to 6 and 16 to 22 Middlesex Street and 3 to 11 Goulston Street, E1
Decision:
On a vote of 4 for and 3 against, the Committee RESOLVED that planning permission for the redevelopment to provide a mixed use development comprising a 17 storey office building rising to a maximum height of 76m (and providing 41,361 sqm office floorspace); 8 storey hotel plus plant room; building (providing 207 guest rooms and comprising 15,002 sqm floorspace); together with 872 sqm of Class A1 to A4 use (retail) floorspace; and ancillary car parking, serving, landscaping and new vehicular access at 4-6 and 16-22 Middlesex Street and 3-11 Goulston Street, E1 be GRANTED subject to
A Any direction by the Mayor
B The prior completion of a legal agreement to secure the following
planning obligations:
|
|
(a) £1,167,180 for transport improvement including public transport and highways, pedestrian and cycle improvements in the vicinity of the site. |
|
|
(b) Affordable housing - £3 million to mitigate against the loss of affordable housing on site. |
|
|
(c) £333,000 for local community, environmental, cultural and heritage facilities and initiatives. |
|
|
(d): Preparation, implantation and review of a Service Management Plan. |
|
|
(d): Preparation, implantation and review of a Green Travel Plan. |
|
|
(e): Public realm improvements |
|
|
(f) TV reception monitoring and mitigation. |
|
|
(g): Completion of a car free agreement to restrict occupants applying for residential parking permits. |
C That the Corporate Director Development and Renewal be delegated authority to negotiate the legal agreement indicated above.
D That the Corporate Director Development and Renewal be delegated authority to impose conditions and informatives on the planning permission to secure the following matters:
Conditions
1. Time Limit
2. Design/materials of external materials proposed.
3. Details of
a) Design of Building to include inclusive design principles
b) Hard and Soft Landscaping
c) External lighting and CCTV scheme
4. Secure by design statement
5. Submission of a statement of the methods of working for the demolition and construction phases.
6. Details of construction of the foul and surface water drainage system.
7. Submission of details of external ventilation/extract ducts to A3 units.
8. Submission of high level/roof top plant and sound attenuation.
9. Submission of details of refuse/recycling proposals.
10. Submission of details of disabled access and inclusive design.
11. Limit hours of operation of restaurant/bat (Mon-Sun 8am to 11pm).
12. Details of Water Efficiency measures.
13. Submission of details of site foundations.
14. Details of renewable energy measures/assessment to meet minimum 10% provision.
15. Cycle storage.
16. Site Management Plan: location and management of plantings, next boxes and green walls.
17. Archaeology Investigation Study.
18. Submission of a Code of Construction Practice (CoCP)
19. Hours of construction (8am to 6pm Monday to Friday; 9am to 5pm on Sat and not at all on Sunday or Bank Holidays).
20. Any other condition considered necessary by the Head of Development Decisions.
Informatives
1. Section 106 agreement required.
2. Section 278 (Highways) agreement required; and
3. Any other informatives considered necessary by the Head of Development Decisions.
4. Construction Environmental Management Plan Advice.
5. Environment Agency Advice.
6. English Heritage Advice.
7. Ecology Advice.
8. Environmental Health Department Advice.
9. Metropolitan Police Advice.
10. Transport Department Advice.
11. London Underground Advice.
12. Landscape department advice.
13. Contact the GLA regarding the energy proposals.
E That if by 13th June 2008, the legal agreement has not been completed to the satisfaction of the Assistant Chief Executive (Legal Services); the Head of Development Decisions be delegated authority to refuse planning permission.
Minutes:
Mr Michael Kiely, Head of Development Decisions, introduced the site and proposal for the redevelopment to provide a mixed use development comprising a 17 storey office building rising to a maximum height of 76m (and providing 41,361 sqm office floorspace); 8 storey hotel plus plant room; building (providing 207 guest rooms and comprising 15,002 sqm floorspace); together with 872 sqm of Class A1 to A4 use (retail) floorspace; and ancillary car parking, serving, landscaping and new vehicular access at 4-6 and 16-22 Middlesex Street and 3-11 Goulston Street, E1.
Mr Terry Natt, Strategic Applications Manager, presented a detailed report on the application, outlining the proposal and explaining the reasons why it had been recommended for approval. He informed the Committee that there was a good Section 106 legal agreement proposed to mitigate any effects from the development.
Members asked questions relating to the financial contributions towards affordable housing, and expressed concern that £1.5 million would be insufficient. Questions were also asked relating to carbon emissions, wind effects, landscaping and the Petticoat Lane Market.
The Committee was advised that a number of conditions had been proposed to ensure the development met carbon emissions targets. The wind effects had been assessed and were considered to be acceptable. Local Area Partnerships would advise on appropriate locations for public realm contributions, in line with the emerging Aldgate Master Plan. Members were reminded that the use of part of the existing site for market stalls was a private agreement with the owner and not for consideration of the Committee.
Members proposed that the Section 106 agreement be amended to include cultural and heritage facilities and initiatives and that the financial contribution towards affordable housing be increased to £3 million. Mr Kiely advised the Committee that increasing the figure for affordable housing could render the application unviable. However, the motion was carried.
Councillor Shahed Ali expressed his concern that the loss of a number of market stalls in Petticoat Lane Market had not been acknowledged in the application, and wished his displeasure to be noted in the minutes.
On a vote of 4 for and 3 against, the Committee RESOLVED that planning permission for the redevelopment to provide a mixed use development comprising a 17 storey office building rising to a maximum height of 76m (and providing 41,361 sqm office floorspace); 8 storey hotel plus plant room; building (providing 207 guest rooms and comprising 15,002 sqm floorspace); together with 872 sqm of Class A1 to A4 use (retail) floorspace; and ancillary car parking, serving, landscaping and new vehicular access at 4-6 and 16-22 Middlesex Street and 3-11 Goulston Street, E1 be GRANTED subject to
A Any direction by the Mayor
B The prior completion of a legal agreement to secure the following
planning obligations:
|
|
(a) £1,167,180 for transport improvement including public transport and highways, pedestrian and cycle improvements in the vicinity of the site. |
|
|
(b) Affordable housing - £3 million to mitigate against the loss of affordable housing on site. |
|
|
(c) £333,000 for local community, environmental, cultural and heritage facilities and initiatives |
|
|
(d): Preparation, implantation and review of a Service Management Plan. |
|
|
(d): Preparation, implantation and review of a Green Travel Plan. |
|
|
(e): Public realm improvements |
|
|
(f) TV reception monitoring and mitigation. |
|
|
(g): Completion of a car free agreement to restrict occupants applying for residential parking permits. |
C That the Corporate Director Development and Renewal be delegated authority to negotiate the legal agreement indicated above.
D That the Corporate Director Development and Renewal be delegated authority to impose conditions and informatives on the planning permission to secure the following matters:
Conditions
1. Time Limit
2. Design/materials of external materials proposed.
3. Details of
a) Design of Building to include inclusive design principles
b) Hard and Soft Landscaping
c) External lighting and CCTV scheme
4. Secure by design statement
5. Submission of a statement of the methods of working for the demolition and construction phases.
6. Details of construction of the foul and surface water drainage system.
7. Submission of details of external ventilation/extract ducts to A3 units.
8. Submission of high level/roof top plant and sound attenuation.
9. Submission of details of refuse/recycling proposals.
10. Submission of details of disabled access and inclusive design.
11. Limit hours of operation of restaurant/bat (Mon-Sun 8am to 11pm).
12. Details of Water Efficiency measures.
13. Submission of details of site foundations.
14. Details of renewable energy measures/assessment to meet minimum 10% provision.
15. Cycle storage.
16. Site Management Plan: location and management of plantings, next boxes and green walls.
17. Archaeology Investigation Study.
18. Submission of a Code of Construction Practice (CoCP)
19. Hours of construction (8am to 6pm Monday to Friday; 9am to 5pm on Sat and not at all on Sunday or Bank Holidays).
20. Any other condition considered necessary by the Head of Development Decisions.
Informatives
1. Section 106 agreement required.
2. Section 278 (Highways) agreement required; and
3. Any other informatives considered necessary by the Head of Development Decisions.
4. Construction Environmental Management Plan Advice.
5. Environment Agency Advice.
6. English Heritage Advice.
7. Ecology Advice.
8. Environmental Health Department Advice.
9. Metropolitan Police Advice.
10. Transport Department Advice.
11. London Underground Advice.
12. Landscape department advice.
13. Contact the GLA regarding the energy proposals.
E That if by 13th June 2008, the legal agreement has not been completed to the satisfaction of the Assistant Chief Executive (Legal Services); the Head of Development Decisions be delegated authority to refuse planning permission.
Supporting documents: