Decision details
Consultations on a new Community Infrastructure Levy (CIL) Charging Schedule and submission for examination
Decision Maker: Cabinet
Decision status: Recommendations Approved
Is Key decision?: No
Is subject to call in?: Yes
Purpose:
Approval to undertake consultations on a new Community Infrastructure Levy Preliminary Draft Charging Schedule and submit for examination.
Decision:
The Pre-Decision Scrutiny Question and Answer were noted.
DECISION
1. To approve the Tower Hamlets CIL Preliminary Draft Charging Schedule (Appendix A of the report) and supporting evidence for a 6 week public consultation.
2. To authorise the Corporate Director of the Place Directorate to:
· Approve minor modifications to the PDCS following the public consultation;
· Where no material modifications are required to the proposed Charging Schedule following the consultation on the PDCS, approve the undertaking of a subsequent consultation on a DCS;
· Where no material modifications are required following the consultation on the DCS, to approve the submission of the Council’s proposed Charging Schedule and associated evidence base for public examination.
3. To note that if material modifications to the Charging Schedule following consultation are required, that approval to undertake a subsequent consultation will be referred to the Mayor in Cabinet.
4. To note BNP Paribas Real Estate’s CIL Viability Study (Appendix B to the report) that forms part of the supporting evidence for the PDCS. The document appended is less its appendices (as they run to 244 pages) – the full document including the appendices is available separately as a background document. The full document will be published for consultation.
5. To note the Supporting Evidence and Funding Gap Report attached at Appendix C to the report. This document explains the infrastructure planning criteria the Council must account for in adopting a new CIL Charging Schedule.
6. To note other associated documents that will be published alongside the PDCS, including:
· An Equality Assurance Checklist (Appendix D to the report – not subject to consultation);
· A Payment in Kind and Infrastructure Payments Policy (Appendix F to the report);
· Charging Schedule Explanatory Notes (Appendix G to the report).
7. Approve the adoption of an updated Instalments Policy (Appendix E to the report).
Action by:
ACTING DIVISIONAL DIRECTOR, PLACE (A. SUTCLIFFE)
(Divisional Director, Planning and Building Control (O. Whalley)
Report author: Corporate Director, Place
Publication date: 21/12/2017
Date of decision: 19/12/2017
Decided at meeting: 19/12/2017 - Cabinet
Effective from: 06/01/2018
Accompanying Documents:
- 5.8 Consultation on a new CIL Charging Structure PDF 142 KB
- 5.8a Appendix A - Proposed Preliminary Draft Charging Schedule with maps PDF 2 MB
- 5.8b Appendix B - Viability Study (no appendices) PDF 504 KB
- 5.8c Appendix C - Supporting Evidence and Funding Gap Report PDF 153 KB
- 5.8d Appendix D - Equality Assurance Checklist PDF 147 KB
- 5.8e Appendix E - Instalments Policy PDF 100 KB
- 5.8f Appendix F - A Payment in Kind and Infrastructure Payments Policy PDF 171 KB
- 5.8g Appendix G - Charging Schedule Explanatory Notes PDF 114 KB